Canadian agency details economic benefits from Darlington nuclear plant revamp

The Darlington Nuclear Plant in Ontario
The Darlington Nuclear Plant in Ontario
0Comments

The Conference Board of Canada (CBC) released a report on Monday detailing economic benefits from Ontario Power Generation’s (OPG) Darlington Nuclear Plant refurbishment project.

The company said approximately 20 percent of electricity in Ontario, Canada, is produced at the facility. The report, released by OPG and prepared by the CBC, said the refurbishment project is expected to benefit Ontario’s gross domestic product by  approximately $14.9 billion by 2026 and that over a 17-year period, approximately 8,800 jobs are expected to be created.

“With approximately 96 percent of the project’s expenditures taking place in Ontario, the refurbishment of the Darlington station would support a significant number of jobs and economic activity in Ontario in a wide range of sectors, including electric power engineering, construction, manufacturing, transportation, and financial and insurance  services,” Deputy Chief Economist of the Conference Board of Canada Pedro Antunes said.

The facility is reaching the midpoint of its operational lifetime, and the OPG is currently investing $12.8 billion into refurbishing the plant, which would support numerous positions in manufacturing, construction, engineering for electrical power and other industries.



Leave a Reply

Your email address will not be published. Required fields are marked *

Related

WINDESCO: WeBoost Platform Increases Annual Output by $3,000 per Megawatts for Longroad Energy’s 145 Megawatts Acquired Wind Plant

WINDESCO: WeBoost Platform Increases Annual Output by $3,000 per Megawatts for Longroad Energy’s 145 Megawatts Acquired Wind Plant

WindESCo Helps Longroad Energy Optimize Wind Asset Performance to Unlock $430,000 in Annual Revenue

ACWA POWER: Signs three agreements for the first foreign investment based independent wind power project in Azerbaijan

ACWA POWER: Signs three agreements for the first foreign investment based independent wind power project in Azerbaijan

Following the signing of the implementation agreement for the $300 million Independent Power Project in January 2020, and under the patronage of the Ministry of Energy in Saudi Arabia, ACWA Power today executed the official agreements for the 240 MW wind power project that will be located in the Absheron and Khizi regions.

CAPITAL DYNAMICS: Exits 108-Megawatt Beacon II and V Solar Portfolio in Kern County, California

CAPITAL DYNAMICS: Exits 108-Megawatt Beacon II and V Solar Portfolio in Kern County, California

Capital Dynamics, an independent global private asset management firm, completed the sale of a majority interest in its Beacon portfolio to TortoiseEcofin and S&B USA Energy. Each buyer has acquired a 49.5% ownership of the portfolio. Capital Dynamics retains a minority stake of 1%.

Trending

The Weekly Newsletter

Sign-up for the Weekly Newsletter from Power News Wire.